As part of the expansion at the factory site, the AMAG2020 Cold Rolling Mill project with passivation was established. The company Elite planned the heat recovery systems, machine cooling with cooling towers, and ventilation systems for the production halls. The cooling of auxiliary rooms was realized using their own refrigeration systems and climate cabinets. The central control technology was integrated into the existing control technology.